Skip to content
Demo — fictional dataBuilt by Algeria Agency

Villas

A whole house, from the roof terrace to the floors, with teams moving forward in parallel.

A renovated villa in Chéraga: white render, blue shutters, a terrace under a pergola.

Renovating a villa is often three jobs in one: making the house watertight, redoing the services, then the finishes. We split the project into packages that run in parallel, with a foreman who keeps the schedule to the half-day.

It is also the moment for what is rarely redone: the roof waterproofing, central heating, the windows. The quote separates clearly what is essential from what can wait for a second round.

What the job covers

  • Roof terrace waterproofing and insulation
  • Central heating, plumbing and electrics
  • Floors, bathrooms and kitchen
  • Aluminium windows, louvres and shutters
  • Façade, render and paint

The steps and how long they take

The typical schedule for this job, worked out like a real project’s: rooms move forward in parallel between the opening and the handover.

Indicative length: 14 working days, Saturday to Thursday.
RoomStepStartsTakesIndicative length: 14 working days, Saturday to Thursday.
SiteSite protectionday 11 d
KitchenStrip-outday 21 d
KitchenPlumbingday 31 d
KitchenElectricsday 32 d
KitchenTiling and splashbackday 53 d
KitchenKitchen fittingday 82 d
KitchenPaintingday 102 d
Main bathroomStrip-outday 22 d
Main bathroomPlumbingday 42 d
Main bathroomElectricsday 41 d
Main bathroomUnder-tile waterproofingday 61 d
Main bathroomTilingday 74 d
Main bathroomSanitarywareday 112 d
Main bathroomCeiling paintday 131 d
Shower roomStrip-outday 22 d
Shower roomPlumbingday 42 d
Shower roomElectricsday 41 d
Shower roomUnder-tile waterproofingday 61 d
Shower roomTilingday 74 d
Shower roomSanitarywareday 112 d
Shower roomCeiling paintday 131 d
Living and sitting roomsElectricsday 21 d
Living and sitting roomsPlaster and false ceilingday 33 d
Living and sitting roomsFlooringday 63 d
Living and sitting roomsPaintingday 93 d
Bedroom 1Electricsday 21 d
Bedroom 1Plaster and false ceilingday 32 d
Bedroom 1Flooringday 52 d
Bedroom 1Paintingday 72 d
Bedroom 2Electricsday 21 d
Bedroom 2Plaster and false ceilingday 32 d
Bedroom 2Flooringday 52 d
Bedroom 2Paintingday 72 d
Bedroom 3Electricsday 21 d
Bedroom 3Plaster and false ceilingday 32 d
Bedroom 3Flooringday 52 d
Bedroom 3Paintingday 72 d
Roof terraceStrip old protectionday 21 d
Roof terraceWaterproofingday 32 d
Roof terraceTerrace tilingday 53 d
SiteCleaning and handoverday 141 d

What is included

  1. The design

    Survey, plan, 3D views and choice of materials with the interior designer.

  2. The quote

    Itemised line by line with product references, fixed once signed.

  3. The works

    Every team, materials delivered from the depot, site protection and cleaning.

  4. The handover

    The final walk-round, snags cleared and the report signed.

  5. The warranty

    Completion, equipment and waterproofing, with someone who answers.

The materials come off our shelves

Every product on the quote is a catalogue product, delivered from our depots and reserved from a single lot for tiles and faïence.

A job like this one

Questions about renovation

Can a villa be renovated in stages?

Yes. We start with what protects the house (waterproofing, services) and plan the finishes over one or more rounds, to suit your budget.

What if a wall has to be opened up?

A light partition can be moved. A load-bearing wall is touched only after a study by a qualified engineer or architect, who designs and validates how the load is carried.

Who coordinates the tradespeople?

The Qarmoud Atelier foreman. You have one point of contact, and every package’s schedule is visible in your space.

Our other services

  • Flats

    Two to five rooms, redone room by room without you having to coordinate the trades.

    Indicative price per m²
    18 000 – 45 000 DA / m²indicative
    Typical job
    14 working days
  • Kitchens

    A kitchen designed around how you work, fitted in two weeks with its services.

    Indicative price per m²
    55 000 – 130 000 DA / m²indicative
    Typical job
    12 working days
  • Bathrooms

    Walk-in shower, wall-hung toilet, zellige or faïence: a watertight bathroom made to last.

    Indicative price per m²
    60 000 – 140 000 DA / m²indicative
    Typical job
    14 working days
  • Roof terraces and waterproofing

    A roof terrace redone in two layers, flood-tested, and turned into a room outdoors if you like.

    Indicative price per m²
    3 500 – 9 000 DA / m²indicative
    Typical job
    8 working days
  • Shops and offices

    A unit fitted out to open on the date announced, with works that do not disturb the neighbours.

    Indicative price per m²
    15 000 – 40 000 DA / m²indicative
    Typical job
    14 working days

Does your project look like this one?

Two minutes to describe the project, then you choose the day of the site visit.

We measure how this site is used with Google Analytics, to learn which pages actually help. You can stop that measurement at any time from the footer.We measure our audience. Cookie policyCookies