Renovating a villa is often three jobs in one: making the house watertight, redoing the services, then the finishes. We split the project into packages that run in parallel, with a foreman who keeps the schedule to the half-day.
It is also the moment for what is rarely redone: the roof waterproofing, central heating, the windows. The quote separates clearly what is essential from what can wait for a second round.
What the job covers
- Roof terrace waterproofing and insulation
- Central heating, plumbing and electrics
- Floors, bathrooms and kitchen
- Aluminium windows, louvres and shutters
- Façade, render and paint
The steps and how long they take
The typical schedule for this job, worked out like a real project’s: rooms move forward in parallel between the opening and the handover.
| Room | Step | Starts | Takes | Indicative length: 14 working days, Saturday to Thursday. |
|---|---|---|---|---|
| Site | Site protection | day 1 | 1 d | |
| Kitchen | Strip-out | day 2 | 1 d | |
| Kitchen | Plumbing | day 3 | 1 d | |
| Kitchen | Electrics | day 3 | 2 d | |
| Kitchen | Tiling and splashback | day 5 | 3 d | |
| Kitchen | Kitchen fitting | day 8 | 2 d | |
| Kitchen | Painting | day 10 | 2 d | |
| Main bathroom | Strip-out | day 2 | 2 d | |
| Main bathroom | Plumbing | day 4 | 2 d | |
| Main bathroom | Electrics | day 4 | 1 d | |
| Main bathroom | Under-tile waterproofing | day 6 | 1 d | |
| Main bathroom | Tiling | day 7 | 4 d | |
| Main bathroom | Sanitaryware | day 11 | 2 d | |
| Main bathroom | Ceiling paint | day 13 | 1 d | |
| Shower room | Strip-out | day 2 | 2 d | |
| Shower room | Plumbing | day 4 | 2 d | |
| Shower room | Electrics | day 4 | 1 d | |
| Shower room | Under-tile waterproofing | day 6 | 1 d | |
| Shower room | Tiling | day 7 | 4 d | |
| Shower room | Sanitaryware | day 11 | 2 d | |
| Shower room | Ceiling paint | day 13 | 1 d | |
| Living and sitting rooms | Electrics | day 2 | 1 d | |
| Living and sitting rooms | Plaster and false ceiling | day 3 | 3 d | |
| Living and sitting rooms | Flooring | day 6 | 3 d | |
| Living and sitting rooms | Painting | day 9 | 3 d | |
| Bedroom 1 | Electrics | day 2 | 1 d | |
| Bedroom 1 | Plaster and false ceiling | day 3 | 2 d | |
| Bedroom 1 | Flooring | day 5 | 2 d | |
| Bedroom 1 | Painting | day 7 | 2 d | |
| Bedroom 2 | Electrics | day 2 | 1 d | |
| Bedroom 2 | Plaster and false ceiling | day 3 | 2 d | |
| Bedroom 2 | Flooring | day 5 | 2 d | |
| Bedroom 2 | Painting | day 7 | 2 d | |
| Bedroom 3 | Electrics | day 2 | 1 d | |
| Bedroom 3 | Plaster and false ceiling | day 3 | 2 d | |
| Bedroom 3 | Flooring | day 5 | 2 d | |
| Bedroom 3 | Painting | day 7 | 2 d | |
| Roof terrace | Strip old protection | day 2 | 1 d | |
| Roof terrace | Waterproofing | day 3 | 2 d | |
| Roof terrace | Terrace tiling | day 5 | 3 d | |
| Site | Cleaning and handover | day 14 | 1 d |
What is included
The design
Survey, plan, 3D views and choice of materials with the interior designer.
The quote
Itemised line by line with product references, fixed once signed.
The works
Every team, materials delivered from the depot, site protection and cleaning.
The handover
The final walk-round, snags cleared and the report signed.
The warranty
Completion, equipment and waterproofing, with someone who answers.
The materials come off our shelves
Every product on the quote is a catalogue product, delivered from our depots and reserved from a single lot for tiles and faïence.
Questions about renovation
Can a villa be renovated in stages?
Yes. We start with what protects the house (waterproofing, services) and plan the finishes over one or more rounds, to suit your budget.
What if a wall has to be opened up?
A light partition can be moved. A load-bearing wall is touched only after a study by a qualified engineer or architect, who designs and validates how the load is carried.
Who coordinates the tradespeople?
The Qarmoud Atelier foreman. You have one point of contact, and every package’s schedule is visible in your space.
Our other services

Flats
Two to five rooms, redone room by room without you having to coordinate the trades.
- Indicative price per m²
- 18 000 – 45 000 DA / m²indicative
- Typical job
- 14 working days

Kitchens
A kitchen designed around how you work, fitted in two weeks with its services.
- Indicative price per m²
- 55 000 – 130 000 DA / m²indicative
- Typical job
- 12 working days

Bathrooms
Walk-in shower, wall-hung toilet, zellige or faïence: a watertight bathroom made to last.
- Indicative price per m²
- 60 000 – 140 000 DA / m²indicative
- Typical job
- 14 working days

Roof terraces and waterproofing
A roof terrace redone in two layers, flood-tested, and turned into a room outdoors if you like.
- Indicative price per m²
- 3 500 – 9 000 DA / m²indicative
- Typical job
- 8 working days

Shops and offices
A unit fitted out to open on the date announced, with works that do not disturb the neighbours.
- Indicative price per m²
- 15 000 – 40 000 DA / m²indicative
- Typical job
- 14 working days