A bathroom is judged in ten years, not on handover day: by no leak into the flat below, by grout that does not blacken, by water that runs to the drain. That is why we lay no tile before the under-tile waterproofing has been applied and tested.
In the small rooms of Algerian flats, a walk-in shower, a wall-hung toilet and a wall-hung vanity win real space. Tiles and faïence are reserved from a single lot so the shade is the same everywhere.
What the job covers
- Full strip-out and rubble removal
- Concealed plumbing and protected electrics
- Under-tile waterproofing, flood-tested
- Tiles, faïence or zellige, epoxy grout in the shower
- Sanitaryware, taps, screen and vanity
The steps and how long they take
The typical schedule for this job, worked out like a real project’s: rooms move forward in parallel between the opening and the handover.
| Room | Step | Starts | Takes | Indicative length: 14 working days, Saturday to Thursday. |
|---|---|---|---|---|
| Site | Site protection | day 1 | 1 d | |
| Bathroom | Strip-out | day 2 | 2 d | |
| Bathroom | Plumbing | day 4 | 2 d | |
| Bathroom | Electrics | day 4 | 1 d | |
| Bathroom | Under-tile waterproofing | day 6 | 1 d | |
| Bathroom | Tiling | day 7 | 4 d | |
| Bathroom | Sanitaryware | day 11 | 2 d | |
| Bathroom | Ceiling paint | day 13 | 1 d | |
| Site | Cleaning and handover | day 14 | 1 d |
What is included
The design
Survey, plan, 3D views and choice of materials with the interior designer.
The quote
Itemised line by line with product references, fixed once signed.
The works
Every team, materials delivered from the depot, site protection and cleaning.
The handover
The final walk-round, snags cleared and the report signed.
The warranty
Completion, equipment and waterproofing, with someone who answers.
The materials come off our shelves
Every product on the quote is a catalogue product, delivered from our depots and reserved from a single lot for tiles and faïence.
Questions about renovation
Can the bath become a level-access shower?
In most cases, yes, with a low-profile tray. The visit checks the fall available to the existing waste.
How long without a bathroom?
About two weeks for a full renovation, drying times included.
Does zellige work in a shower?
Yes, on proper waterproofing and with epoxy grout, which does not stain and lets no water through.
Our other services

Flats
Two to five rooms, redone room by room without you having to coordinate the trades.
- Indicative price per m²
- 18 000 – 45 000 DA / m²indicative
- Typical job
- 14 working days

Villas
A whole house, from the roof terrace to the floors, with teams moving forward in parallel.
- Indicative price per m²
- 22 000 – 60 000 DA / m²indicative
- Typical job
- 14 working days

Kitchens
A kitchen designed around how you work, fitted in two weeks with its services.
- Indicative price per m²
- 55 000 – 130 000 DA / m²indicative
- Typical job
- 12 working days

Roof terraces and waterproofing
A roof terrace redone in two layers, flood-tested, and turned into a room outdoors if you like.
- Indicative price per m²
- 3 500 – 9 000 DA / m²indicative
- Typical job
- 8 working days

Shops and offices
A unit fitted out to open on the date announced, with works that do not disturb the neighbours.
- Indicative price per m²
- 15 000 – 40 000 DA / m²indicative
- Typical job
- 14 working days