A shop is renovated against the clock: rent is already running and an opening has been announced. We build the schedule backwards from the opening date, with a margin, and keep to it.
The fit-out starts from how your customers and staff move: the window, the till, the stockroom, the lighting that shows off the products, and a fuse board sized for your equipment.
What the job covers
- Layout plan and 3D views
- Partitions, false ceilings and stockroom
- Electrics, window lighting and a compliant fuse board
- Floors that take the footfall
- Works at off-peak hours where needed
The steps and how long they take
The typical schedule for this job, worked out like a real project’s: rooms move forward in parallel between the opening and the handover.
| Room | Step | Starts | Takes | Indicative length: 14 working days, Saturday to Thursday. |
|---|---|---|---|---|
| Site | Site protection | day 1 | 1 d | |
| Sales floor | Electrics | day 2 | 1 d | |
| Sales floor | Plaster and false ceiling | day 3 | 3 d | |
| Sales floor | Flooring | day 6 | 3 d | |
| Sales floor | Painting | day 9 | 3 d | |
| Office and stockroom | Electrics | day 2 | 1 d | |
| Office and stockroom | Plaster and false ceiling | day 3 | 2 d | |
| Office and stockroom | Flooring | day 5 | 2 d | |
| Office and stockroom | Painting | day 7 | 2 d | |
| Washroom | Strip-out | day 2 | 2 d | |
| Washroom | Plumbing | day 4 | 2 d | |
| Washroom | Electrics | day 4 | 1 d | |
| Washroom | Under-tile waterproofing | day 6 | 1 d | |
| Washroom | Tiling | day 7 | 4 d | |
| Washroom | Sanitaryware | day 11 | 2 d | |
| Washroom | Ceiling paint | day 13 | 1 d | |
| Site | Cleaning and handover | day 14 | 1 d |
What is included
The design
Survey, plan, 3D views and choice of materials with the interior designer.
The quote
Itemised line by line with product references, fixed once signed.
The works
Every team, materials delivered from the depot, site protection and cleaning.
The handover
The final walk-round, snags cleared and the report signed.
The warranty
Completion, equipment and waterproofing, with someone who answers.
The materials come off our shelves
Every product on the quote is a catalogue product, delivered from our depots and reserved from a single lot for tiles and faïence.
Questions about renovation
Can you work at night?
Yes, at off-peak hours, when neighbouring shops or a shopping centre require it.
What about occupied offices?
We plan by zones, so the business carries on while we work on another part of the floor.
Do you supply the shop furniture?
No: we fit out the unit. Specific furniture remains your choice; we plan its position and its power.
Our other services

Flats
Two to five rooms, redone room by room without you having to coordinate the trades.
- Indicative price per m²
- 18 000 – 45 000 DA / m²indicative
- Typical job
- 14 working days

Villas
A whole house, from the roof terrace to the floors, with teams moving forward in parallel.
- Indicative price per m²
- 22 000 – 60 000 DA / m²indicative
- Typical job
- 14 working days

Kitchens
A kitchen designed around how you work, fitted in two weeks with its services.
- Indicative price per m²
- 55 000 – 130 000 DA / m²indicative
- Typical job
- 12 working days

Bathrooms
Walk-in shower, wall-hung toilet, zellige or faïence: a watertight bathroom made to last.
- Indicative price per m²
- 60 000 – 140 000 DA / m²indicative
- Typical job
- 14 working days

Roof terraces and waterproofing
A roof terrace redone in two layers, flood-tested, and turned into a room outdoors if you like.
- Indicative price per m²
- 3 500 – 9 000 DA / m²indicative
- Typical job
- 8 working days