A flat is rarely renovated at the wave of a wand: dated wiring, a bathroom to redo, mismatched floors, a kitchen that is too small. We look at the whole at the visit, then order the job so each trade comes through once, at the right moment.
For a new AADL flat handed over bare, as for an older flat in central Algiers, the schedule allows for the building’s constraints: the lift, quiet hours, protecting the common parts and truck access for deliveries.
What the job covers
- Electrics and plumbing brought up to standard
- Floors and faïence in every room
- A complete kitchen and bathroom
- False ceilings, cornices, recessed lighting
- Paint, interior doors and joinery
The steps and how long they take
The typical schedule for this job, worked out like a real project’s: rooms move forward in parallel between the opening and the handover.
| Room | Step | Starts | Takes | Indicative length: 14 working days, Saturday to Thursday. |
|---|---|---|---|---|
| Site | Site protection | day 1 | 1 d | |
| Kitchen | Strip-out | day 2 | 1 d | |
| Kitchen | Plumbing | day 3 | 1 d | |
| Kitchen | Electrics | day 3 | 2 d | |
| Kitchen | Tiling and splashback | day 5 | 3 d | |
| Kitchen | Kitchen fitting | day 8 | 2 d | |
| Kitchen | Painting | day 10 | 2 d | |
| Bathroom | Strip-out | day 2 | 2 d | |
| Bathroom | Plumbing | day 4 | 2 d | |
| Bathroom | Electrics | day 4 | 1 d | |
| Bathroom | Under-tile waterproofing | day 6 | 1 d | |
| Bathroom | Tiling | day 7 | 4 d | |
| Bathroom | Sanitaryware | day 11 | 2 d | |
| Bathroom | Ceiling paint | day 13 | 1 d | |
| Living room | Electrics | day 2 | 1 d | |
| Living room | Plaster and false ceiling | day 3 | 3 d | |
| Living room | Flooring | day 6 | 3 d | |
| Living room | Painting | day 9 | 3 d | |
| Bedroom 1 | Electrics | day 2 | 1 d | |
| Bedroom 1 | Plaster and false ceiling | day 3 | 2 d | |
| Bedroom 1 | Flooring | day 5 | 2 d | |
| Bedroom 1 | Painting | day 7 | 2 d | |
| Bedroom 2 | Electrics | day 2 | 1 d | |
| Bedroom 2 | Plaster and false ceiling | day 3 | 2 d | |
| Bedroom 2 | Flooring | day 5 | 2 d | |
| Bedroom 2 | Painting | day 7 | 2 d | |
| Site | Cleaning and handover | day 14 | 1 d |
What is included
The design
Survey, plan, 3D views and choice of materials with the interior designer.
The quote
Itemised line by line with product references, fixed once signed.
The works
Every team, materials delivered from the depot, site protection and cleaning.
The handover
The final walk-round, snags cleared and the report signed.
The warranty
Completion, equipment and waterproofing, with someone who answers.
The materials come off our shelves
Every product on the quote is a catalogue product, delivered from our depots and reserved from a single lot for tiles and faïence.
Questions about renovation
Can we live in the flat during the works?
For a full renovation, no: dust and the water and power being off make life there hard. For a staged renovation, we can plan room by room and keep a bathroom working.
Do we need the building’s agreement?
For works inside the flat, telling the managing agent and the neighbours is usually enough. Touching the common parts, the façade or the risers needs agreement before starting.
How long for a three-room flat?
Two to three working weeks for a complete three-room flat, depending on its starting state. Your project’s schedule is worked out after the visit and followed day by day in your space.
Our other services

Villas
A whole house, from the roof terrace to the floors, with teams moving forward in parallel.
- Indicative price per m²
- 22 000 – 60 000 DA / m²indicative
- Typical job
- 14 working days

Kitchens
A kitchen designed around how you work, fitted in two weeks with its services.
- Indicative price per m²
- 55 000 – 130 000 DA / m²indicative
- Typical job
- 12 working days

Bathrooms
Walk-in shower, wall-hung toilet, zellige or faïence: a watertight bathroom made to last.
- Indicative price per m²
- 60 000 – 140 000 DA / m²indicative
- Typical job
- 14 working days

Roof terraces and waterproofing
A roof terrace redone in two layers, flood-tested, and turned into a room outdoors if you like.
- Indicative price per m²
- 3 500 – 9 000 DA / m²indicative
- Typical job
- 8 working days

Shops and offices
A unit fitted out to open on the date announced, with works that do not disturb the neighbours.
- Indicative price per m²
- 15 000 – 40 000 DA / m²indicative
- Typical job
- 14 working days