Flats

Two to five rooms, redone room by room without you having to coordinate the trades.

Living room after: marble-look floor, smooth stone-coloured walls, an aluminium balcony door.

A flat is rarely renovated at the wave of a wand: dated wiring, a bathroom to redo, mismatched floors, a kitchen that is too small. We look at the whole at the visit, then order the job so each trade comes through once, at the right moment.

For a new AADL flat handed over bare, as for an older flat in central Algiers, the schedule allows for the building’s constraints: the lift, quiet hours, protecting the common parts and truck access for deliveries.

What the job covers

  • Electrics and plumbing brought up to standard
  • Floors and faïence in every room
  • A complete kitchen and bathroom
  • False ceilings, cornices, recessed lighting
  • Paint, interior doors and joinery

The steps and how long they take

The typical schedule for this job, worked out like a real project’s: rooms move forward in parallel between the opening and the handover.

Indicative length: 14 working days, Saturday to Thursday.
RoomStepStartsTakesIndicative length: 14 working days, Saturday to Thursday.
SiteSite protectionday 11 d
KitchenStrip-outday 21 d
KitchenPlumbingday 31 d
KitchenElectricsday 32 d
KitchenTiling and splashbackday 53 d
KitchenKitchen fittingday 82 d
KitchenPaintingday 102 d
BathroomStrip-outday 22 d
BathroomPlumbingday 42 d
BathroomElectricsday 41 d
BathroomUnder-tile waterproofingday 61 d
BathroomTilingday 74 d
BathroomSanitarywareday 112 d
BathroomCeiling paintday 131 d
Living roomElectricsday 21 d
Living roomPlaster and false ceilingday 33 d
Living roomFlooringday 63 d
Living roomPaintingday 93 d
Bedroom 1Electricsday 21 d
Bedroom 1Plaster and false ceilingday 32 d
Bedroom 1Flooringday 52 d
Bedroom 1Paintingday 72 d
Bedroom 2Electricsday 21 d
Bedroom 2Plaster and false ceilingday 32 d
Bedroom 2Flooringday 52 d
Bedroom 2Paintingday 72 d
SiteCleaning and handoverday 141 d

What is included

  1. The design

    Survey, plan, 3D views and choice of materials with the interior designer.

  2. The quote

    Itemised line by line with product references, fixed once signed.

  3. The works

    Every team, materials delivered from the depot, site protection and cleaning.

  4. The handover

    The final walk-round, snags cleared and the report signed.

  5. The warranty

    Completion, equipment and waterproofing, with someone who answers.

The materials come off our shelves

Every product on the quote is a catalogue product, delivered from our depots and reserved from a single lot for tiles and faïence.

A job like this one

Questions about renovation

Can we live in the flat during the works?

For a full renovation, no: dust and the water and power being off make life there hard. For a staged renovation, we can plan room by room and keep a bathroom working.

Do we need the building’s agreement?

For works inside the flat, telling the managing agent and the neighbours is usually enough. Touching the common parts, the façade or the risers needs agreement before starting.

How long for a three-room flat?

Two to three working weeks for a complete three-room flat, depending on its starting state. Your project’s schedule is worked out after the visit and followed day by day in your space.

Our other services

  • Villas

    A whole house, from the roof terrace to the floors, with teams moving forward in parallel.

    Indicative price per m²
    22 000 – 60 000 DA / m²indicative
    Typical job
    14 working days
  • Kitchens

    A kitchen designed around how you work, fitted in two weeks with its services.

    Indicative price per m²
    55 000 – 130 000 DA / m²indicative
    Typical job
    12 working days
  • Bathrooms

    Walk-in shower, wall-hung toilet, zellige or faïence: a watertight bathroom made to last.

    Indicative price per m²
    60 000 – 140 000 DA / m²indicative
    Typical job
    14 working days
  • Roof terraces and waterproofing

    A roof terrace redone in two layers, flood-tested, and turned into a room outdoors if you like.

    Indicative price per m²
    3 500 – 9 000 DA / m²indicative
    Typical job
    8 working days
  • Shops and offices

    A unit fitted out to open on the date announced, with works that do not disturb the neighbours.

    Indicative price per m²
    15 000 – 40 000 DA / m²indicative
    Typical job
    14 working days

Does your project look like this one?

Two minutes to describe the project, then you choose the day of the site visit.