An eleven-square-metre kitchen that finally works
Light oak and matt-white units, a terrazzo floor and a splashback that wipes clean: the kitchen of a family house in Draria, redone in two weeks.
- Town
- Draria
- Kind
- Kitchens
- Area
- 11 m²
- Length of the works
- 12 working days
- Budget
- 1 150 000 DAindicative, materials and labour


Before the works
Dark units swollen by damp under the sink, cracked faïence behind the cooker, one socket for four appliances and a worktop too low for everyone. The room was the right size; nothing in it was in the right place.
What was done
Asma redrew the layout as an L to clear the way to the courtyard: the sink under the window, the hob on the solid wall, the oven tower at the end of the run. The 3D plan was signed off in one sitting, with the terrazzo and faïence samples on the table.
Works began with the strip-out and the services: a water supply moved, a dedicated circuit for the oven and hob, six sockets above the worktop. The terrazzo went down on a repaired screed, then matt-white faïence the full height of the splashback.
The units went up in two days, the laminate worktop was cut on site for the sink and the hob, and the hood was connected to the existing flue. A primer and two coats of matt paint finished the walls and ceiling.
The steps
| Room | Step | Starts | Takes | Works schedule, in working days from Saturday to Thursday |
|---|---|---|---|---|
| Site | Site protection | day 1 | 1 d | |
| Kitchen | Strip-out | day 2 | 1 d | |
| Kitchen | Plumbing | day 3 | 1 d | |
| Kitchen | Electrics | day 3 | 2 d | |
| Kitchen | Tiling and splashback | day 5 | 3 d | |
| Kitchen | Kitchen fitting | day 8 | 2 d | |
| Kitchen | Painting | day 10 | 2 d | |
| Site | Cleaning and handover | day 12 | 1 d |
The products used
All of them from the Qarmoud catalogue and our depots.
- 60 cm base unit — matt whiteKitchen
- 60 cm wall unit — matt whiteKitchen
- 60 cm tall oven unit — matt whiteKitchen
- Oak laminate worktop — 3 mKitchen
- Stainless sink, 1 bowl + drainerKitchen
- Chrome kitchen mixer, swivel spoutKitchen
- 60 cm stainless visor hoodKitchen
- White terrazzo 40 × 40 polishedTiles & wall tiles
- Rectified matt white wall tile 30 × 60 mattTiles & wall tiles
- C1 tile adhesive — 25 kg bagTiles & wall tiles
- Matt acrylic paint — 15 L bucketPaint
The team
- Asma BenamaraInterior designer, Qarmoud AtelierFictional character
- Adel MekhalfaRenovation project manager, Qarmoud AtelierFictional character
- Abdelkader GhezaliSite foremanFictional character
Other jobs

Bathrooms — Bab Ezzouar
Six square metres, a walk-in shower and green zellige
- Area
- 6 m²
- Length
- 14 working days
- Budget
- 780 000 DA

Flats — Hydra
A thirty-four-square-metre living room, bright from floor to ceiling
- Area
- 34 m²
- Length
- 12 working days
- Budget
- 1 320 000 DA

Roof terraces and waterproofing — Blida
A roof terrace redone before the autumn rains
- Area
- 96 m²
- Length
- 8 working days
- Budget
- 690 000 DA

Villas — Kouba
A white lime façade with blue shutters, as it should be
- Area
- 180 m²
- Length
- 21 working days
- Budget
- 1 480 000 DA

Shops and offices — El Biar
A shop in El Biar that opened on the day announced
- Area
- 62 m²
- Length
- 14 working days
- Budget
- 2 100 000 DA

Villas — Chéraga
A villa in Chéraga renovated from the roof terrace to the heating
- Area
- 210 m²
- Length
- 14 working days
- Budget
- 9 800 000 DA